More About Geeks on Steroids...

Geeks on Steroids has been building custom designed websites for over eight years. Geeks on Steroids has a staff of six people at this time and while it is a small staff it is the perfect size for us. If you are looking for a company that gives a home town feel then you are in the right place because we want every client to be our best friend.

Another Tit-Bit...

Geeks on Steroids did search engine optimization for a select group of clients several years ago but decided to get out of online marketing for other people and focus on our own sites. This year after many meeting and lots of talks we have decided to once again start offering search engine optimization.

Blackout In All Colombia

The manager of XM company, in charge of administing wholesale energy for Colombia, said that the services are recovering in 90 percents of the national territory and will happen between 2 to 4 hours.

The civil employee said that according to the information he had collected, one of the switches at the substation Torca in the north of Bogota, where the high tension cables arrive, did not open correctly and triggered a blackout in all the country.

“Protection systems Exist that would prevent and over flow of power. But the switch did not open and allowed the problem to overrun the country.

Interconexión Eléctrica SA and the Ministry of Defense said this was not a terrorist attack.

The manager of ISA, Luis Fernando Alarcón, showed that the fault was registered in the station of Torca, near Bogota, that extended to all the National network.

They are saying it was a technical problem in the substation Torca in Bogota but the causes have not yet been determined.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Reddit
  • StumbleUpon
  • Google Bookmarks
  • Yahoo! Buzz
  • Twitter
  • Technorati
  • Live
  • LinkedIn
  • MySpace

Leave a Reply

You must be logged in to post a comment.